Project Name: Ruwais Refinery Expansion, Takreer
Location: Abu Dhabi, United Arab Emirates
Client: Samsung
Year: 2013
From the client’s Front End Engineering Design (FEED), M&I-Labtech developed detailed engineering plans defining the laboratory layout, Gas Distribution System (GDS), Laboratory Furniture layout as well as the methods applicable to the instruments to be installed.
The size of the laboratory was 17,000 sq. ft. and greater than 220 instruments and applicable methods for each instrument were part of this project. The M&I-Labtech engineering contribution enabled timely installation and commissioning of the entire lab in 14 months as agreed upon with the clients. A team of about thirty technically qualified people and experts from M&I-Labtech worked on and successfully completed the project